TotalEnergies commissions floating LNG terminal
Published by Callum O'Reilly,
Senior Editor
Hydrocarbon Engineering,
TotalEnergies has announced the commissioning of the Cape Ann, its floating storage and regasification unit (FSRU) for LNG located in the port of Le Havre, France.
The terminal has injected its first megawatt-hours (MWh) of gas into the grid operated by GRTgaz, using LNG from Norway.
TotalEnergies has contracted 50% of the terminal's annual capacity of around 5 billion m3, to supply it with LNG from its global portfolio. The remaining capacity will be marketed according to rules approved by the regulator.
Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/26102023/totalenergies-commissions-floating-lng-terminal/
You might also like
The Hydrocarbon Engineering Podcast - Insights into the UN Global Plastics Treaty negotiations
In this episode of the Hydrocarbon Engineering Podcast, Rob Benedict, Vice President, Petrochemicals and Midstream, American Fuel & Petrochemical Manufacturers (AFPM), discusses the outcomes of the final round of UN negotiations for a Global Plastics Treaty.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.