Skip to main content

Nakilat-Keppel receives first FSRU at Erhama Bin Jaber Al Jalahma Shipyard

Published by , Editorial Assistant
Hydrocarbon Engineering,


Nakilat-Keppel Offshore & Marine (N-KOM) has recently received its first floating storage and regasification unit (FSRU) project at the Erhama Bin Jaber Al Jalahma Shipyard.

The FSRU owned by Excelerate Energy (USA) will undergo drydocking, maintenance and upgrades at the facility.

During its drydocking, the FSRU will undergo several modifications and retrofitting of new systems, including the installation of a ballast water treatment system (BWTS).

To date, N-KOM has completed six such BWTS installations for various types of vessels such as LNG and LPG vessels as well as very large crude carriers (VLCCs).

Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/23012019/nakilat-keppel-receives-first-fsru-at-erhama-bin-jaber-al-jalahma-shipyard/

You might also like

The Hydrocarbon Engineering Podcast - Midstream matters

In this episode of the Hydrocarbon Engineering Podcast, Sarah Miller, President and CEO of the GPA Midstream Association, joins us to consider the vital importance of midstream operations, and some of the key challenges and opportunities facing the sector.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news Middle East downstream news