Skip to main content

Chart Industries granted LNTP for LNG project

Published by , Senior Editor
Hydrocarbon Engineering,


Chart Industries Inc. has announced that it has received additional limited notice to proceed (LNTP) for its IPMSR® process and equipment activities to be used in Cheniere’s Corpus Christi Stage Three LNG export terminal project.

In conjunction with the LNTP, Chart booked an order of US$47.5 million for the project from Bechtel.

Chart will begin recognising revenue on this project in 2022 with a multi-year staggered delivery schedule.

Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/08032022/chart-industries-granted-lntp-for-lng-project/

You might also like

Hydrocarbon Engineering podcast

Hydrocarbon Engineering Podcast

Mike Logue, Owens Corning Global Business Director – Mechanical Insulation, delves into factors that can support the performance, safety and longevity of insulating systems installed in hydrocarbon processing environments, including cryogenic facilities.

Listen for free today »

 

Watlow expands facility in Malaysia

Watlow accelerates growth in Malaysia with expanded facility and long-term commitment to southeast Asia’s industrial development.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news