TEN Ltd announces 36-month market-related charters for two product tankers
Published by Alex Hithersay,
Editorial Assistant
Hydrocarbon Engineering,
TEN Ltd has announced 36-month long charters with minimum/maximum provisions for two product tankers to a major oil concern.
At a minimum, these two fixtures combined are expected to generate US$33.0 million of gross revenues.
Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/08012019/ten-ltd-announces-36-month-market-related-charters-for-two-product-tankers/
You might also like
The Hydrocarbon Engineering Podcast - Protecting against LNG pool fires
In this episode of the Hydrocarbon Engineering Podcast, Alec Cusick, Owens Corning Technical Lead, Technical Insulation, joins us to talk about the risks of LNG pool fires and methodologies to mitigate these risks.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.
