Klaipedos nafta signs agreement for Brazilian LNG terminal
Published by Jessica Casey,
Editor
Hydrocarbon Engineering,
Klaipedos nafta (KN), Açu Serviços de Terminal de GNL Ltd (the Brazilian SPV) and UTE GNA Geração de Energia S.A. (GNA) have signed an agreement for the provision of operations and maintenance services in connection with GNA’s LNG terminal, located in the Port of Açu in the state of Rio de Janeiro, one of the main port complexes in Brazil, which offers a series of logistics solutions for the Brazilian oil and gas market.
KN has been appointed as an operator of the LNG terminal, which will provide safe, reliable and efficient operations, including maintenance of the jetty and its installations, gas pipeline and gas metering stations, as well as supporting the commissioning of the LNG terminal.
The agreement will become effective once GNA receives its remaining corporate and lenders’ approvals. The initial term of the agreement is for a 13-year operational period following the completion of the LNG terminal, and can be extended upon mutual agreement. The LNG terminal is due to start operations in 2020.
Read the article online at: https://www.hydrocarbonengineering.com/tanks-terminals/03022020/klaipedos-nafta-signs-agreement-for-brazilian-lng-terminal/
You might also like
Hydrocarbon Engineering Podcast
Mike Logue, Owens Corning Global Business Director – Mechanical Insulation, delves into factors that can support the performance, safety and longevity of insulating systems installed in hydrocarbon processing environments, including cryogenic facilities.
Watlow expands facility in Malaysia
Watlow accelerates growth in Malaysia with expanded facility and long-term commitment to southeast Asia’s industrial development.