AECOM conducts study for refined product pipeline
Published by Anna Nicklin,
Assistant Editor
Hydrocarbon Engineering,
Holly Energy Partners L.P. (HEP) has engaged AECOM to perform a feasibility study on a potential refined product pipeline from Orla to Midland, Texas, US. This potential pipeline is part of HEP’s continuous efforts to serve growing distillate demand in the Permian Basin with additional infrastructure projects. The pipeline would complement the company’s existing footprint in the Basin and the recently-announced truck loading rack project in Orla.
HEP expects the pipeline to have an initial capacity of 40 000 bpd and be in service as early as 3Q19, subject to receipt of necessary regulatory approvals, permits and commercial support.
Read the article online at: https://www.hydrocarbonengineering.com/refining/25072018/aecom-conducts-study-for-refined-product-pipeline/
You might also like
The Hydrocarbon Engineering Podcast - Insights into the UN Global Plastics Treaty negotiations
In this episode of the Hydrocarbon Engineering Podcast, Rob Benedict, Vice President, Petrochemicals and Midstream, American Fuel & Petrochemical Manufacturers (AFPM), discusses the outcomes of the final round of UN negotiations for a Global Plastics Treaty.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.