Petrofac awarded EPC contract from Basra Oil Co.
Published by Nicholas Woodroof,
Editor
Hydrocarbon Engineering,
Under the terms of the 34-month contract, the lump-sum EPC project scope of work includes two oil processing trains, able to process 200 000 bpd.
Petrofac was previously awarded a contract in 2011 and delivered EPC management for the execution and completion of the existing CPF at Majnoon.
Elie Lahoud, Group Managing Director, Engineering & Construction - Iraq, Oman and Saudi Arabia, commented: "We have developed a significant track record in Iraq with enhanced local delivery, successfully providing services both onshore and offshore since 2010. This important contract win demonstrates Petrofac's long-lasting client relationships and our ongoing commitment to extending our operations in this key market that complements our broad service capabilities, international experience and expertise."
Read the article online at: https://www.hydrocarbonengineering.com/refining/13082018/petrofac-awarded-epc-contract-from-basra-oil-co/
You might also like
The Hydrocarbon Engineering Podcast - Protecting against LNG pool fires
In this episode of the Hydrocarbon Engineering Podcast, Alec Cusick, Owens Corning Technical Lead, Technical Insulation, joins us to talk about the risks of LNG pool fires and methodologies to mitigate these risks.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.
