Skip to main content

Goltens to retrofit ten Optimarin Ballast Water Treatment systems

Published by , Digital Assistant Editor
Hydrocarbon Engineering,


Goltens Worldwide has stated that the Defence Material Organisation has awarded three contracts to its Green Technologies business unit for the engineering and turnkey installation of sixteen optimarin ballast systems (OBS) on ten naval vessels.

An official signing ceremony was held in May 2016 at the Defence Material Organisation in The Hague whereby Captain RNLN J. F. Kwak, Head Projects Procurement Division, officially signed the contract on behalf of the Ministry of Defence. M. C. Jeronimus, Vice President of Goltens Europe, signed on behalf of Goltens Green Technologies.

Goltens Green Technologies will engineer and install the UV-based ballast water treatment systems (BWTS) onboard the Royal Netherlands Navy vessels during 2016 and 2017, ensuring compliance with both the pending IMO and existing US Coast Guard regulations on ballast water treatment.

Optimarin’s DNV-GL type approved system is fully compliant with the IMO Ballast Water Management Convention, which is currently just shy of the 35% of global tonnage it requires for ratification, and holds an AMS certificate from the USCG. In addition, it is now in the final stages of full USCG approval, with certification anticipated for 2H16.

Landing Platform Dock (LPD) vessels HNLMS Rotterdam and HNLMS Johan de Witt, the frigates HNLMS Tromp, HNLMS Evertsen, HNLMS De Zeven Provinciën and HNLMS De Ruyter, as well as special purpose vessels MOV Van Kinsbergen, HNLMS Pelikaan, HNLMS Luymes and HNLMS Snellius will all be fitted with ballast treatment systems during their scheduled maintenance periods.

Edited from press release by

Read the article online at: https://www.hydrocarbonengineering.com/product-news/26052016/goltens-to-retrofit-ten-optimarin-ballast-water-treatment-systems-2545/

You might also like

 
 

Embed article link: (copy the HTML code below):