Skip to main content

BASF replaces plant for 2-Mercaptoethanol in Ludwigshafen

Published by , Senior Editor
Hydrocarbon Engineering,


A new BASF production plant for the intermediate 2-mercaptoethanol (2-ME) at the Ludwigshafen Verbund site in Germany started regular operations in 4Q21.

After a trial run of several months, it replaces the previous plant at the Ludwigshafen site, which is being closed after more than 40 years of operation. The new plant is fully integrated into BASF's production Verbund and, with more than 10 000 tpy of 2-ME, has the same production capacity as the previous plant. 2-ME has proven its value in the production of plastics, crop protection products, oilfield chemicals (Basocorr® ME) and coatings.

"The new plant will enable us to supply our customers all over the world with 2-mercaptoethanol even more reliably. Our global logistics network, which our customers can further rely on, also contributes to this," said Frank Stein, Head of the Regional Business Unit Europe in BASF's Intermediates division.

Read the article online at: https://www.hydrocarbonengineering.com/petrochemicals/14022022/basf-replaces-plant-for-2-mercaptoethanol-in-ludwigshafen/

You might also like

The Hydrocarbon Engineering Podcast - Overcoming downstream challenges with new technology

In this episode of the Hydrocarbon Engineering Podcast, Omar Sayeed, Centre of Excellence Leader for Reliability, and Rahul Negi, Director of AI and Industrial Autonomous, Honeywell Process Solutions, consider how new, innovative technology can help to overcome some of the challenges facing the downstream oil and gas sector.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news