Skip to main content

Toyo to construct naphtha cracking furnaces at Chiba plant

Published by
Hydrocarbon Engineering,


Toyo Engineering Corp. has secured a contract to add two naphtha cracking furnaces to increase ethylene production at Maruzen Petrochemical Co’s Chiba plant in Japan.

Toyo has executed various projects for Maruzen Petrochemical since 1967, and will carry out this project towards completion, scheduled for 2020 under the safety-first policy.

Toyo’s domestic subsidiary, TEC Project Services Corporation (TPS), will be mainly responsible for construction work.

Read the article online at: https://www.hydrocarbonengineering.com/petrochemicals/10082018/toyo-to-construct-naphtha-cracking-furnaces-at-chiba-plant/

You might also like

Catalysts 2019

Catalysts 2019

Catalysts 2019 is an online conference for professionals in the downstream sector. Since this is a completely virtual conference, you can join us from anywhere in the world, absolutely free. Register for free today »

 
 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Asia Pacific downstream news Downstream petrochemical news