INEOS progresses ethylene oxide and derivative project
Published by Anna Nicklin,
Assistant Editor
Hydrocarbon Engineering,
Following a detailed study, INEOS Oxide is moving forward with the next stage of its project to construct an ethylene oxide (EO) and ethylene oxide derivatives (EOD) facility on the US Gulf Coast. It is planned that the asset will be operational in 2022.
Frederick Rulander, COO INEOS Oxide North America, said: “This exciting project for INEOS is an important part of our expansion plans in the US. It allows us to address a fast growing EO merchant market as well as our own requirements. The project builds on our experience in Europe as the largest EO and Ethoxylate producer.”
INEOS is planning a plant that is initially capable of producing around 270 000 tpy (600 million lbs) of EO, with ethoxylate derivative capacity on-site. In addition to supply by rail, the project will allow third-parties to co-locate on site and consume EO by pipeline, as required. A similar approach to our highly successful asset based in Antwerp.
INEOS is considering several sites on the US Gulf Coast and are well advanced in evaluating competing EO technologies.
Confirmation of the investment location and technology partner are expected later this year.
Read the article online at: https://www.hydrocarbonengineering.com/petrochemicals/08062018/ineos-progresses-ethylene-oxide-and-derivative-project/
You might also like
Hydrocarbon Engineering Podcast
Mike Logue, Owens Corning Global Business Director – Mechanical Insulation, delves into factors that can support the performance, safety and longevity of insulating systems installed in hydrocarbon processing environments, including cryogenic facilities.
Advario and Braskem Idesa inaugurate US$500 million ethane storage terminal in Veracruz, Mexico
Developed as a 50 - 50 partnership between the two companies, the terminal marks a major milestone in Mexico’s energy and petrochemical infrastructure.