Skip to main content

TotalEnergies commissions floating LNG terminal

Published by , Senior Editor
Hydrocarbon Engineering,


TotalEnergies has announced the commissioning of the Cape Ann, its floating storage and regasification unit (FSRU) for LNG located in the port of Le Havre, France.

The terminal has injected its first megawatt-hours (MWh) of gas into the grid operated by GRTgaz, using LNG from Norway.

TotalEnergies has contracted 50% of the terminal's annual capacity of around 5 billion m3, to supply it with LNG from its global portfolio. The remaining capacity will be marketed according to rules approved by the regulator.

Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/26102023/totalenergies-commissions-floating-lng-terminal/

You might also like

The Hydrocarbon Engineering Podcast - Process safety improvements in the downstream sector

In this episode of the Hydrocarbon Engineering Podcast, Lara Swett, Vice President of Technical & Safety Programs, American Fuel & Petrochemical Manufacturers (AFPM), joins us to explain how the downstream sector has continued to improve its process safety record.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news