Neste Jacobs awarded a framework agreement
Published by Angharad Lock,
Digital Assistant Editor
Hydrocarbon Engineering,
Neste Jacobs has signed a five-year framework agreement with Gasum for engineering and project implementation services. The agreement comprises engineering, project management, procurement, HSE and documentation services for Gasum's gas network and biogas projects in Finland.
Neste Jacobs has a long-standing relationship with Gasum.
"We are very pleased to continue our cooperation with Gasum and provide our services in these engineering and implementation projects", commented Jarmo Suominen, CEO of Neste Jacobs. "This agreement is significant in our extensive and wide-ranged cooperation with Gasum which includes also active development of Finland's LNG infrastructure."
"We are convinced of Neste Jacobs' capabilities to carry out the assignments within the agreement and have been pleased with the services provided by Neste Jacobs so far", added Mika Simola, Head of Project Management, Gasum Ltd.
Edited from press release by Angharad Lock
Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/24022016/gasum-awards-framework-agreement-539/
You might also like
Hydrocarbon Engineering Podcast
Rasmus Rubycz, Market Manager for New Energy at Atlas Copco Gas and Process, considers how heat pumps as an industrial technology are gaining greater attention as a result of the increased drive for sustainability and the challenges and opportunities of electrification of process heat.
EIA reports US natural gas production remained flat in 2024
According to the Energy Information Administration, US natural gas production remained relatively flat in 2024, growing at a slower rate than in 2023.