Skip to main content

Exmar FSRU departs for Singapore

Published by , Editor
Hydrocarbon Engineering,


Exmar has announced that its FSRU barge, delivered at the end of 2017, has left the Wison offshore marine shipyard in Shanghai, China and is en route to Singapore.

Upon arrival the unit will undergo site specific modifications before departing to its project destination to commence its long-term employment mid-2018, in line with its time charter commitments.

Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/22022018/exmar-fsru-departs-for-singapore/

You might also like

The Hydrocarbon Engineering Podcast - Midstream matters

In this episode of the Hydrocarbon Engineering Podcast, Sarah Miller, President and CEO of the GPA Midstream Association, joins us to consider the vital importance of midstream operations, and some of the key challenges and opportunities facing the sector.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news Asia Pacific downstream news