Skip to main content

CB&I win EPC contract for Kearl oilsands project

Hydrocarbon Engineering,


CB&I has been awarded a contract by Imperial Oil Resources for engineering, procurement and construction work on the Kearl oilsands project in Alberta, Canada. The value of CB&I’s work scope is in excess of US$ 900 million, which includes US$ 500 million of incremental work releases booked prior to 2011.

CB&I will be responsible for the EPC execution of the bitumen extraction plant and tank farms, as well as the design, supply and construction of additional storage vessels, all of which are expected to be completed in the third quarter of 2012.

“This award builds on CB&I’s proven experience in the Canadian oil sands,” said Philip K. Asherman, President and CEO. "We are pleased to have supported Imperial Oil on this important energy project since its inception, and we look forward to expanding our relationship with them into the future.”

Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/16032011/cbandi_win_epc_contract_for_kearl_oilsands_project/

You might also like

The Hydrocarbon Engineering Podcast - Education and training for every phase of the insulating system design process

In this episode of the Hydrocarbon Engineering Podcast, Brandon Stambaugh, Owens Corning Director for Technical Services, joins us to discuss engineers’ demand for education and training to support the critical phases that affect the performance and longevity of insulating systems.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):