Gazprom and Lukoil meet
Published by Joseph Green,
Editor
Hydrocarbon Engineering,
The Gazprom headquarters today hosted a working meeting between Alexey Miller, Chairman of the Company's Management Committee and Vagit Alekperov, President of LUKOIL.
The parties paid special attention to joint activities for arranging the processing of associated petroleum gas (APG) from the northern group of LUKOIL-Komi fields at the Sosnogorsk gas processing plant (GPP) of Gazprom. The process flow diagram for transmission, receiving and treatment of APG was approved. Pre-construction and pre-development of essential gas transmission facilities are in progress.
The meeting also regarded the prospects for supplying gas from the LUKOIL-Ukhtaneftepererabotka refinery to the Sosnogorsk GPP for its further processing into marketable products (liquefied petroleum gases, stabilised condensate).
Adapted from press release by Joe Green
Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/12122014/gazprom-lukoil-address-associated-gas-processing-sosnogorsk-1774/
You might also like
The Hydrocarbon Engineering Podcast - Education and training for every phase of the insulating system design process
In this episode of the Hydrocarbon Engineering Podcast, Brandon Stambaugh, Owens Corning Director for Technical Services, joins us to discuss engineers’ demand for education and training to support the critical phases that affect the performance and longevity of insulating systems.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.