Gazprom and Lukoil meet
Published by Joseph Green,
Editor
Hydrocarbon Engineering,
The Gazprom headquarters today hosted a working meeting between Alexey Miller, Chairman of the Company's Management Committee and Vagit Alekperov, President of LUKOIL.
The parties paid special attention to joint activities for arranging the processing of associated petroleum gas (APG) from the northern group of LUKOIL-Komi fields at the Sosnogorsk gas processing plant (GPP) of Gazprom. The process flow diagram for transmission, receiving and treatment of APG was approved. Pre-construction and pre-development of essential gas transmission facilities are in progress.
The meeting also regarded the prospects for supplying gas from the LUKOIL-Ukhtaneftepererabotka refinery to the Sosnogorsk GPP for its further processing into marketable products (liquefied petroleum gases, stabilised condensate).
Adapted from press release by Joe Green
Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/12122014/gazprom-lukoil-address-associated-gas-processing-sosnogorsk-1774/
You might also like
Hydrocarbon Engineering Podcast
Mike Logue, Owens Corning Global Business Director – Mechanical Insulation, delves into factors that can support the performance, safety and longevity of insulating systems installed in hydrocarbon processing environments, including cryogenic facilities.
Watlow expands facility in Malaysia
Watlow accelerates growth in Malaysia with expanded facility and long-term commitment to southeast Asia’s industrial development.