Skip to main content

GTT receives order for the tank design of four LNG carriers

Published by , Editorial Assistant
Hydrocarbon Engineering,


Gaztransport & Technigaz (GTT) has received an order from the Korean shipyard Hyundai Heavy Industries (HHI) concerning the tank design of four new LNG carriers.

The carriers will be built on behalf of the Greek ship-owner Capital Gas Carriers.

GTT's Mark III Flex technology has been selected to equip the LNG tanks of the four 174 000 m3 ships. The delivery of these vessels is scheduled between the end of 2020 and mid-2021.

Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/10092018/gtt-receives-order-for-the-tank-design-of-four-lng-carriers/

You might also like

The Hydrocarbon Engineering Podcast - Travelling towards sustainability: exploring the economics of e-fuels

In this special episode, a panel of experts from Johnson Matthey, A.P. Moller - Maersk, Honeywell, HIF Global and the Methanol Institute provide a clear analysis of the factors influencing e-fuel pricing, the economic challenges, and strategies for cost reduction.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):