Yamal LNG begins gas exports from second LNG train
Published by Nicholas Woodroof,
Editor
Hydrocarbon Engineering,
This train adds an additional 5.5 million tpy of LNG capacity to the facility, bringing the total capacity in operation to 11 million tpy. At full capacity, the three-train facility will supply 16.5 million tpy of LNG to Asian and European markets. The third train is expected to start up in early 2019.
“Following the successful start-up of Yamal LNG in December last year, the first shipment from the second train ahead of schedule is another major milestone for this world-class LNG project,” said Patrick Pouyanné, Chairman and CEO of Total. “The Yamal LNG production adds competitive LNG resources to our growing portfolio. We will keep developing new LNG projects in the Russian Arctic with our strategic partner Novatek, as illustrated by the recent announcement of our entry in Arctic LNG 2 with 10% direct working interest.”
Last May, Novatek and Total also agreed that Total will have the opportunity to acquire a 10 to 15% direct interest in Novatek's future LNG projects in Yamal and Gydan.
Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/09082018/yamal-lng-begins-gas-exports-from-second-lng-train/
You might also like
The Hydrocarbon Engineering Podcast - Education and training for every phase of the insulating system design process
In this episode of the Hydrocarbon Engineering Podcast, Brandon Stambaugh, Owens Corning Director for Technical Services, joins us to discuss engineers’ demand for education and training to support the critical phases that affect the performance and longevity of insulating systems.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.