Freeport LNG receives approval to restart final liquefaction train
Published by Bella Weetch,
Editorial Assistant
Hydrocarbon Engineering,
Freeport LNG Development, L.P. (Freeport LNG) has announced that it has received regulatory approvals from the Federal Energy Regulatory Commission (FERC) and the Pipeline and Hazardous Materials Safety Administration (PHMSA) to restart Train 1, the final train of Freeport LNG’s three train liquefaction facility to receive restart authorisation.
Freeport LNG’s Trains 2 and 3 returned to full commercial operation in recent weeks, reaching production levels in excess of 1.5 billion ft3/d. As the recommissioning of Freeport’s liquefaction facility continues and trains are restarted, changes in feed gas flows and production rates are to be anticipated, given the duration of the plant’s outage.
As previously stated, a conservative ramp-up profile to establish full three-train production is anticipated to occur over the next few weeks.
Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/09032023/freeport-lng-receives-approval-to-restart-final-liquefaction-train/
You might also like
The Hydrocarbon Engineering Podcast - Education and training for every phase of the insulating system design process
In this episode of the Hydrocarbon Engineering Podcast, Brandon Stambaugh, Owens Corning Director for Technical Services, joins us to discuss engineers’ demand for education and training to support the critical phases that affect the performance and longevity of insulating systems.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.