Skip to main content

Sound Energy provides Nervesa production update

Published by , Digital Assistant Editor
Hydrocarbon Engineering,


Sound Energy, the Mediterranean and European focused upstream gas company, has provided the following production update:

The company has confirmed that following first gas on 3 February 2016, clean up operations at the onshore Nervesa gas discovery continue. Sound Energy has limited early production to an initial rate of 1.0 million ft3/d during daytime hours and 0.7 million ft3/d overnight. The company plans to increase production levels over the coming months to the planned production rate of 1.8 million ft3/d.

Edited from press release by

Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/09022016/sound-energy-provides-nervesa-production-update-2041/

You might also like

The Hydrocarbon Engineering Podcast - Education and training for every phase of the insulating system design process

In this episode of the Hydrocarbon Engineering Podcast, Brandon Stambaugh, Owens Corning Director for Technical Services, joins us to discuss engineers’ demand for education and training to support the critical phases that affect the performance and longevity of insulating systems.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):