Skip to main content

Baker Hughes to supply liquefaction trains for NextDecade’s Rio Grande LNG Project

Published by , Assistant Editor
Hydrocarbon Engineering,


Baker Hughes has been awarded an order by Bechtel Energy Inc. (Bechtel) to supply three main refrigerant compressors (MRCs) for NextDecade’s Rio Grande LNG project in the Port of Brownsville, Texas, US.

In total, Baker Hughes will supply six Frame 7 gas turbines, paired with 18 centrifugal compressors across Rio Grande’s first three LNG trains in a parallel configuration arrangement, providing more operational flexibility for a nameplate capacity of 17.61 million tpy.

Ganesh Ramaswamy, Executive Vice President of Industrial and Energy Technology at Baker Hughes, said: “This order builds on our longstanding relationship with Bechtel and is a significant milestone in our partnership with NextDecade, supporting them on this key LNG project. We are delighted that our technology solution will support the production of LNG in the US, which is crucial in balancing energy affordability, security and sustainability globally.”

The Baker Hughes gas technology solution chosen for Rio Grande LNG provides NextDecade with the highest production levels for the plant’s design, as well as operational flexibility and high availability. The Frame 7 gas turbine is well-proven for its energy efficiency, availability, reliability and maintainability.

Packaging of the turbine/compressor train, as well as assembly of the compressors and testing of the trains, will take place at Baker Hughes’ facilities in Italy.

The announcement follows another recent contract awarded by Bechtel to Baker Hughes to supply two liquefaction trains for another LNG project in Texas, US, announced in March 2023.

Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/07072023/baker-hughes-to-supply-liquefaction-trains-for-nextdecades-rio-grande-lng-project/

You might also like

The Hydrocarbon Engineering Podcast - Education and training for every phase of the insulating system design process

In this episode of the Hydrocarbon Engineering Podcast, Brandon Stambaugh, Owens Corning Director for Technical Services, joins us to discuss engineers’ demand for education and training to support the critical phases that affect the performance and longevity of insulating systems.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news North America downstream news Downstream contract news