Skip to main content

BP enters third long-term LNG offtake contract from Woodfibre’s British Columbia LNG facility

Published by , Assistant Editor
Hydrocarbon Engineering,


BP has entered its third long-term LNG offtake contract from the Woodfibre LNG facility based in British Columbia, Canada. With the additional contract to offtake 0.45 million tpy of LNG for 15 years on a free on board (FOB) basis, all of the LNG production from the Woodfibre LNG export facility is now committed for sale to BP, with firm offtake totalling 1.95 million tpy and the remainder on a flexible offtake basis.

BP continues to look for opportunities across the gas value chain, as it sees LNG as an essential part of the energy transition and its own pivot to becoming an integrated energy company. As BP works towards building an LNG portfolio of 30 million t by 2030, the additional Canadian west coast supply source expands BP’s flexible, high-quality LNG portfolio and enhances the company’s capability to meet the growing global natural gas demand.

In addition to securing LNG offtake rights from the project, BP will provide safe and reliable transportation of gas to the Woodfibre LNG export facility during the 15-year contact term.

Jonathan Shepard, VP global LNG trading and origination at BP, said: “As the world seeks secure, affordable and lower carbon energy, global demand for LNG is expected to continue to grow and this additional Canadian supply source will further enhance BP’s supply positions in the Pacific region. We look forward to continuing our close collaboration with Woodfibre LNG.”

Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/06092023/bp-enters-third-long-term-lng-offtake-contract-from-woodfibres-british-columbia-lng-facility/

You might also like

The Hydrocarbon Engineering Podcast - Education and training for every phase of the insulating system design process

In this episode of the Hydrocarbon Engineering Podcast, Brandon Stambaugh, Owens Corning Director for Technical Services, joins us to discuss engineers’ demand for education and training to support the critical phases that affect the performance and longevity of insulating systems.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news Downstream contract news