Technip Energies to offer new solution for LNG production
Published by Poppy Clements,
Assistant Editor
Hydrocarbon Engineering,
SnapLNG by T.EN™ is a 2.5 million tpy electrically driven LNG train solution comprised of reproducible modules ready for delivery and installation. These modules operate autonomously and are pre-commissioned, for the delivery of a complete natural gas liquefaction plant, accelerating time to market and saving more than two years on total project duration compared to a conventional project.
The design offers certainty in cost execution, delivery schedule, plant reliability and availability, as well as production performance for a significant increase in annual revenues and a reduction of ~350kTe/year of CO2 emission per train versus a gas turbine solution.
Loïc Chapuis, SVP Gas & Low Carbon Energies at Technip Energies, said: "This solution enables our clients to achieve considerable time savings and greater operational certainty and reliability while reaching their zero-emissions objectives. With SnapLNG by T.EN, Technip Energies strengthens its position in the LNG sector and as a trusted and committed partner supporting its clients in their transition to a low-carbon economy."
Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/05092023/technip-energies-to-offer-new-solution-for-lng-production/
You might also like
The Hydrocarbon Engineering Podcast - Education and training for every phase of the insulating system design process
In this episode of the Hydrocarbon Engineering Podcast, Brandon Stambaugh, Owens Corning Director for Technical Services, joins us to discuss engineers’ demand for education and training to support the critical phases that affect the performance and longevity of insulating systems.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.