Skip to main content

GTT receives order notification for a new LNG carrier

Published by , Editorial Assistant
Hydrocarbon Engineering,


Gaztransport & Technigas (GTT) has received a new order notification from a Korean shipyard for the tank design of a new 174 000 m3 LNG carrier (LNGC), to be built on behalf of a European ship-owner.

The LNG tanks of the vessel will be equipped with the Mark III Flex containment system developed by GTT. The vessel's delivery is expected during the second half of 2020.

For confidentiality purposes, the names of the contracting parties of the project cannot be disclosed.

Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/05092018/gtt-receives-order-notification-for-a-new-lng-carrier/

You might also like

The Hydrocarbon Engineering Podcast - Travelling towards sustainability: exploring the economics of e-fuels

In this special episode, a panel of experts from Johnson Matthey, A.P. Moller - Maersk, Honeywell, HIF Global and the Methanol Institute provide a clear analysis of the factors influencing e-fuel pricing, the economic challenges, and strategies for cost reduction.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):