Skip to main content

KPE completes gas processing plant

Published by , Senior Editor
Hydrocarbon Engineering,


KP Engineering LP (KPE) has announced the on-schedule, on-budget completion of the Joyce 200 million ft3/d cryogenic gas processing unit (Cryo) for Targa Pipeline Mid-Continent WestTex LLC, a subsidiary of Targa Resources Corp.

The Joyce Cryo plant is located in Rankin, Texas, US.

KPE provided complete engineering, procurement and construction (EPC) services for the project, which included the main processing unit, compression, balance of plant items and associated infrastructure. The cryogenic gas processing unit is designed to cool natural gas, which allows the separation of pipeline-quality dry natural gas and valuable natural gas liquids (NGLs).

"We are proud to safely complete the Joyce Cryo unit on-time and on-budget for Targa," said William E. Preston, President and Chief Operating Officer of KP Engineering.

Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/05042018/kpe-completes-gas-processing-plant/

You might also like

The Hydrocarbon Engineering Podcast - Insights into the UN Global Plastics Treaty negotiations

In this episode of the Hydrocarbon Engineering Podcast, Rob Benedict, Vice President, Petrochemicals and Midstream, American Fuel & Petrochemical Manufacturers (AFPM), discusses the outcomes of the final round of UN negotiations for a Global Plastics Treaty.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news