Coastal Bend LNG initiates development of LNG export facility
Published by Ellie Brosnan,
Editorial Assistant
Hydrocarbon Engineering,
Coastal Bend LNG’s planned development will include up to five 4.5 million tpy liquefaction trains, cogeneration, LNG storage tanks, and export facilities for shipping, bunkering, and ISO containers. Carbon capture, transport, and storage will be integrated into Coastal Bend LNG’s facilities to deliver low carbon intensity natural gas sourced from US onshore basins.
“We are responding to growing global demand for low carbon intensity LNG,” said Nick Flores, CEO of Coastal Bend LNG. “The integration of carbon capture on both our liquefaction and cogeneration facilities will deliver low carbon intensity LNG while monetising both 45Q tax credits and our low-carbon products.”
Coastal Bend LNG expects to pre-file its Federal Energy Regulatory Commission (FERC) permits during 2025.
Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/01072025/coastal-bend-lng-initiates-development-of-lng-export-facility/
You might also like
The Hydrocarbon Engineering Podcast - Overcoming downstream challenges with new technology
In this episode of the Hydrocarbon Engineering Podcast, Omar Sayeed, Centre of Excellence Leader for Reliability, and Rahul Negi, Director of AI and Industrial Autonomous, Honeywell Process Solutions, consider how new, innovative technology can help to overcome some of the challenges facing the downstream oil and gas sector.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.