Skip to main content

Baker Hughes to supply technology for Blue Point Number One

Published by , Editorial Assistant
Hydrocarbon Engineering,


Baker Hughes has announced an award from Technip Energies to supply a steam turbine generator along with critical centrifugal compression equipment for the Blue Point Number One Ammonia Project in Modeste, Louisiana, US.

The facility, a joint venture between CF Industries, Mitsui & Co., and JERA, is set to be the world’s largest low-carbon ammonia plant with a nameplate capacity of approximately 1.4 million tpy. The order was booked in 3Q25.

Baker Hughes’ critical technology solutions will enable the Blue Point Number One Ammonia Project to produce blue ammonia through an autothermal reforming (ATR) process along with an integrated CCS system designed to sequester up to 2.3 million tpy of CO2. Baker Hughes’ scope includes a range of compressors, including an ammonia compressor, a syngas compressor, a recycle compressor, and a CO2 compressor, to deliver the captured CO2 to geological storage via pipeline, as well as a steam turbine-driven BRUSH™ Power Generation generator.

Ammonia is recognised for its potential as a low-carbon energy source and increasingly vital for achieving decarbonisation goals in hard-to-abate sectors, including agriculture, power, and marine. Through Baker Hughes’ differentiated technology portfolio, the company provides integrated solutions that address the demanding specifications of complex, large scale projects.

“Ammonia, as a lower-carbon energy source, is poised to play a pivotal role in enabling and accelerating global sustainable energy development,” said Alessandro Bresciani, Senior Vice President of Energy Equipment at Baker Hughes. “As ammonia expands from agricultural and chemical use to a global commodity for energy, we are proud to support the scaling of it with our proven technology solutions for one of the world’s largest low-carbon ammonia projects.”

The ATR ammonia production facility will be constructed at CF Industries’ Blue Point Complex in Louisiana, and the project will permanently store up to 2.3 million tpy of CO2 in a Class VI well.

Construction of the ammonia production facility is expected to begin in 2026, with low-carbon ammonia production expected in 2029.

Read the article online at: https://www.hydrocarbonengineering.com/clean-fuels/28102025/baker-hughes-to-supply-technology-for-blue-point-number-one/

You might also like

The Hydrocarbon Engineering Podcast - Evaluating the challenges and opportunities of CCUS

In this episode of the Hydrocarbon Engineering Podcast, Andrea Bombardi, Executive Vice President, RINA, offers technical and operational insight into some of the key challenges and opportunities of CCUS implementation.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news Downstream contract news Decarbonisation news