Launch of second stage of Urengoyskoe field
Published by Joseph Green,
Editor
Hydrocarbon Engineering,
SeverEnergia (a joint venture between Novatek and Gazprom Neft) has launched the second stage of the Urengoyskoye field (within the Samburgskiy license area) including the second train of the gas condensate de-ethanisation unit.
Overall capacity of the two stages of field development is approximately 13 billion m3 of natural gas and more than 4.7 million t of de-ethanised gas condensate per annum.
The wells drilled at the Urengoyskoye field target the Achimov deposits, which are characterised by relatively high depth (approximately 3700m) and high share of gas condensate in the hydrocarbon flow.
Adapted from press release by Joe Green
Read the article online at: https://www.hydrocarbonengineering.com/refining/19122014/launch-second-stage-urengoyskoe-field-severenergia/
You might also like
The Hydrocarbon Engineering Podcast - Insights into the UN Global Plastics Treaty negotiations
In this episode of the Hydrocarbon Engineering Podcast, Rob Benedict, Vice President, Petrochemicals and Midstream, American Fuel & Petrochemical Manufacturers (AFPM), discusses the outcomes of the final round of UN negotiations for a Global Plastics Treaty.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.