Launch of second stage of Urengoyskoe field
                            
                                
                                
                                        
                                            
                                        
                                
                                    
                                        Published by Joseph Green,
                                        Editor 
                                        
                                    
                                Hydrocarbon Engineering,
                                
                            
                        
SeverEnergia (a joint venture between Novatek and Gazprom Neft) has launched the second stage of the Urengoyskoye field (within the Samburgskiy license area) including the second train of the gas condensate de-ethanisation unit.
Overall capacity of the two stages of field development is approximately 13 billion m3 of natural gas and more than 4.7 million t of de-ethanised gas condensate per annum.
The wells drilled at the Urengoyskoye field target the Achimov deposits, which are characterised by relatively high depth (approximately 3700m) and high share of gas condensate in the hydrocarbon flow.
Adapted from press release by Joe Green
Read the article online at: https://www.hydrocarbonengineering.com/refining/19122014/launch-second-stage-urengoyskoe-field-severenergia/
You might also like
The Hydrocarbon Engineering Podcast - Evaluating the challenges and opportunities of CCUS
In this episode of the Hydrocarbon Engineering Podcast, Andrea Bombardi, Executive Vice President, RINA, offers technical and operational insight into some of the key challenges and opportunities of CCUS implementation.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.
                                