Hardbanding Solutions release new standard operating programme
Published by Joseph Green,
Editor
Hydrocarbon Engineering,
A new standard operating procedure for the application of Duraband® NC hardbanding on completion tubing connections has just been released by Hardbanding Solutions by Postle Industries.
The upset connections of 2-7/8 and 2-3/8 tubing are experiencing excessive wear in many drilling environments, especially horizontal drilling.
This excessive wear is not allowing the normal amount of recuts, effectively causing the tubing to be scrapped before reaching 100% of its useful life.
This procedure, which has been shown to significantly increase service life, calls for the application of Duraband NC hardbanding to both pin and box near the taper, allowing for multiple re-cuts as necessary. This procedure applies for both new and re-applications.
Adapted from a press release by Joe Green
Read the article online at: https://www.hydrocarbonengineering.com/product-news/03122014/hardbanding-duraband-postle-industries-tubing-connections-1040/
You might also like
Hydrocarbon Engineering Podcast
Susan Bell, Senior Vice President within Commodity Markets – Oil, Rystad Energy, discusses the impact of trade wars on global oil demand and oil prices, in light of President Trump’s ‘Liberation Day’ tariffs.
VERSO ENERGY and GROUPE ADP partner to develop SAF
VERSO ENERGY and GROUPE ADP have signed a strategic partnership to develop the SAF sector on French, European, and international airport platforms.