Skip to main content

BCCK to design a nitrogen rejection unit facility in the Permian Basin

Published by , Editorial Assistant
Hydrocarbon Engineering,


BCCK, a leader in engineering, procurement, fabrication and field construction services, has been selected to design and fabricate a NiTech® nitrogen rejection unit (NRU) facility in the Permian Basin.

The grassroots facility will utilise BCCK’s premier NiTech NRU technology in West Texas. The project will use BCCK’s 220 million ft3/d NiTech Style IV NRU designed optimally for plants operating in both ethane recovery and in rejection. The Style IV NRU features a modular skidded design resulting in a more economical installation. The Style IV is the company’s latest update and is capable of high recoveries for optimal efficiency and lower greenhouse emissions.

Greg Hall, Executive Vice President, BCCK, said: “We are excited for the opportunity to expand our reach in West Texas and demonstrate BCCK’s vast gas processing and nitrogen removal knowledge through our patented NiTech NRU process.”

For more than 30 years, BCCK’s NiTech NRU has delivered gas processing and NRU solutions.

Read the article online at: https://www.hydrocarbonengineering.com/petrochemicals/15062023/bcck-to-design-a-nitrogen-rejection-unit-facility-in-the-permian-basin/

You might also like

The Hydrocarbon Engineering Podcast - The energy sector's evolving digital landscape

In this episode of the Hydrocarbon Engineering Podcast, Graham Faiz, Head of Digital Energy, DNV, dives into the current state of digitalisation, the key drivers behind transformation, and how companies can move from pilot projects to full-scale deployment of AI and digital tools.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):