Hengli Petrochemical starts up PTA line
Published by Nicholas Woodroof,
Editor
Hydrocarbon Engineering,
Hengli’s fifth PTA line with 2.5 million tpy, utilising INVISTA’s P8 PTA technology, successfully started up on 29 June 2020.
Hengli also operates another four PTA lines on the same site on Changxing Island, Dalian, China, all of which utilise advantaged PTA technology licensed from INVISTA, with a total capacity of 11.6 million tpy. This makes Hengli the largest PTA producing site in the world.
Adam Sackett, IPT vice president PTA, commented: “I congratulate Hengli on achieving another important milestone this year. The successful start-up of Hengli’s 5th PTA line yet again highlights the quick ramp-up capability of PTA plants utilising our technology. Fast project execution, trouble-free and stable operation at low variable cost, enables our licensees to achieve a good return on their PTA investment.”
Read the article online at: https://www.hydrocarbonengineering.com/petrochemicals/03082020/hengli-petrochemical-starts-up-pta-line/
You might also like
The Hydrocarbon Engineering Podcast - Midstream matters
In this episode of the Hydrocarbon Engineering Podcast, Sarah Miller, President and CEO of the GPA Midstream Association, joins us to consider the vital importance of midstream operations, and some of the key challenges and opportunities facing the sector.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.