Gujarat State Petronet Ltd (GSPL) commissions Chhara Gas Pipeline
A natural gas pipeline connecting the Greenfield 5 million tpy LNG regasification terminal at Chhara in the Gir-Somnath district with the gas grid was commissioned on 20 March 2025.
A natural gas pipeline connecting the Greenfield 5 million tpy LNG regasification terminal at Chhara in the Gir-Somnath district with the gas grid was commissioned on 20 March 2025.