Magnolia LNG contract extended
Published by Angharad Lock,
Digital Assistant Editor
Hydrocarbon Engineering,
Liquefied Natural Gas Ltd (LNGL) has extended the validity period of its current binding engineering, procurement, and construction (EPC) contract with KSJV (a KBR – SKE&C joint venture led by KBR) for its wholly owned subsidiary, Magnolia LNG, LLC (Magnolia). The binding lump sum turnkey (LSTK) EPC contract is now valid through December 2017.
LNGL Managing Director and Chief Executive Officer, Greg Vesey, stated: “The extension of our agreement with KBR-SK E&C provides us with additional confidence as we focus on finalizing offtake agreements and moving toward a final investment decision (FID) for Magnolia, while we also maintain Magnolia’s standing as the low cost, low risk, construction ready Gulf Coast LNG export project.”
Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/13062017/magnolia-lng-contract-extended/
You might also like
Hydrocarbon Engineering Podcast
Mike Logue, Owens Corning Global Business Director – Mechanical Insulation, delves into factors that can support the performance, safety and longevity of insulating systems installed in hydrocarbon processing environments, including cryogenic facilities.
Aduro and Cleanfarms develop pathway for chemical recycling of challenging plastics
Aduro Clean Technologies and Cleanfarms have signed an MoU to collaborate on development of commercial pathway for challenging agricultural plastics.