Skip to main content

The Summer issue of Tanks and Terminals is now online.

Published by , Assistant Editor
Hydrocarbon Engineering,


The Summer issue of Tanks and Terminals is now online.

The Summer issue of Tanks & Terminals covers a range of topics including tank inspections, protection and repairs; leak detection and overfill prevention; safety; and decommissioning projects. This month’s regional report looks at the latest developments in Europe, and we also have a Guest Comment from Kathryn Clay, the President of the ILTA.

This issue is packed full of technical articles from the likes of Rosen Group, Varec, Adler & Allan, Emerson, Belzona Polymerics Ltd, IntelliView Technologies Inc., Rotork, Sky Bitz and more.

View the Tanks and Terminals Issue »

Read the article online at: https://www.hydrocarbonengineering.com/special-reports/29052020/the-summer-issue-of-tanks-and-terminals-is-now-online/

You might also like

The Hydrocarbon Engineering Podcast - Education and training for every phase of the insulating system design process

In this episode of the Hydrocarbon Engineering Podcast, Brandon Stambaugh, Owens Corning Director for Technical Services, joins us to discuss engineers’ demand for education and training to support the critical phases that affect the performance and longevity of insulating systems.

Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.

Apple Podcasts  Spotify Podcasts  YouTube

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Downstream news