ONEOK expands Canadian Valley natural gas processing facility
Published by Anna Nicklin,
Assistant Editor
Hydrocarbon Engineering,
ONEOK, Inc. has announced plans to double its Canadian Valley natural gas processing facility in the STACK play of western Oklahoma, USA, to 400 million ft3/d to support increasing production growth.
The Canadian Valley II project in Canadian County, Oklahoma, is expected to be completed by the end of 2018. The expansion and related infrastructure is expected to cost approximately US$155 million - US$165 million.
The expansion of Canadian Valley, in conjunction with the recently announced 200 million ft3/d firm offload agreement to a third-party processor, will bring ONEOK's total natural gas processing capacity in Oklahoma to approximately 1.1 billion ft3/d by 2019. Additionally, NGLs produced from the expansion are expected to add approximately 20 000 bpd of additional volumes to ONEOK's existing Oklahoma NGL gathering system.
"The doubling of processing capacity at Canadian Valley is needed to capture rapidly increasing customer production in the STACK play," said Terry K. Spencer, ONEOK President and CEO. "The expansion will provide producers in the area with essential natural gas processing capacity."
Read the article online at: https://www.hydrocarbonengineering.com/gas-processing/01082017/oneok-expands-canadian-valley-natural-gas-processing-facility/
You might also like
The Hydrocarbon Engineering Podcast - Overcoming downstream challenges with new technology
In this episode of the Hydrocarbon Engineering Podcast, Omar Sayeed, Centre of Excellence Leader for Reliability, and Rahul Negi, Director of AI and Industrial Autonomous, Honeywell Process Solutions, consider how new, innovative technology can help to overcome some of the challenges facing the downstream oil and gas sector.
Tune in to the Hydrocarbon Engineering Podcast on your favourite podcast app today.