KT (MAIRE) awarded contract by Eni
Published by Poppy Clements,
Editorial Assistant
Hydrocarbon Engineering,
The value of the contract is €123 million, and the project is scheduled for completion in 2026.
The plant to be designed and built by KT will process natural gas and biogenic feedstocks to create hydrogen for the production of biofuels for mobility at the Livorno (Italy) site processing various biogenic feedstocks, mainly waste such as cooking oils and animal fats, and residues from the agribusiness industry. In addition, the plant is designed so that a residual CO2 capture unit can be implemented at a later stage.
The construction of the new unit is part of Eni’s project to convert its Livorno plant into a biorefinery.
Alessandro Bernini, MAIRE CEO, commented: “We are proud of this important achievement with Eni. MAIRE confirms once again its role as a provider of innovative technologies and integrated engineering services, contributing to the decarbonisation of transport through increasing biofuel production."
Read the article online at: https://www.hydrocarbonengineering.com/clean-fuels/21022024/kt-maire-awarded-contract-by-eni/
You might also like
Low US distillate consumption reflects slow economic activity and biofuel substitution
The EIA reports that US distillate consumption so far this year is lower than usual because of warm winter weather, reduced manufacturing activity, and continued substitution of biofuels in place of petroleum distillate on the US West Coast (PADD 5).