Skip to main content

Trecora begins production

Published by , Editorial Assistant
Hydrocarbon Engineering,


Trecora Resources, a leading provider of high purity specialty hydrocarbons and waxes, has announced that it has initiated production at the recently acquired BASF plant adjacent to Trecora Chemical (TC) in Pasadena, Texas. The first production run is a new high purity specialty wax product that could not be handled at TC due to capacity constraints.

Peter Loggenberg, President of Trecora Chemical, commented, "The BASF facility, which we refer to as 'B Plant,' is being integrated with our TC facility, and we are pleased to be generating revenue within just a few weeks of the acquisition. With B Plant online, we are reviewing several projects that could drive additional revenue this year for TC while also gaining significant operating efficiencies."

B Plant includes production equipment that is similar to TC's plus equipment that broadens TC's capabilities and potential markets. The 6.5 acre site also includes substantial storage capacity, several rail and truck loading sites and utility tie ins to TC.


Adapted from press release by Francesca Brindle

Read the article online at: https://www.hydrocarbonengineering.com/petrochemicals/06062016/trecora-resources-initiates-production-at-newly-acquired-basf-plant-3453/

You might also like

Hydrocarbon Engineering podcast

Hydrocarbon Engineering Podcast

Rasmus Rubycz, Market Manager for New Energy at Atlas Copco Gas and Process, considers how heat pumps as an industrial technology are gaining greater attention as a result of the increased drive for sustainability and the challenges and opportunities of electrification of process heat.

Listen for free today »

 
 
 

Embed article link: (copy the HTML code below):