Skip to main content

GTT receives order notification for a new LNG carrier

 

Published by
Hydrocarbon Engineering,

Gaztransport & Technigas (GTT) has received a new order notification from a Korean shipyard for the tank design of a new 174 000 m3 LNG carrier (LNGC), to be built on behalf of a European ship-owner.

The LNG tanks of the vessel will be equipped with the Mark III Flex containment system developed by GTT. The vessel's delivery is expected during the second half of 2020.

For confidentiality purposes, the names of the contracting parties of the project cannot be disclosed.

 

This article has been tagged under the following:

Downstream news Asia Pacific downstream news Europe downstream news Downstream contract news Downstream petrochemical news Downstream contract news