Skip to main content

NEXTCHEM to upgrade BSR'S hydrogen production unit in Vietnam

 

Published by
Hydrocarbon Engineering,

NEXTCHEM, through its subsidiary KT Tech, has been awarded by Binh Son Refining and Petrochemical Joint Stock Co. (BSR) the licensing and the process design package (PDP) for a new hydrogen production unit, as part of the larger upgrading and expansion project of Dung Quat Refinery in Vietnam.
KT Tech will design the new hydrogen production unit with a capacity of 22 676 m3/h, leveraging on its technology. This technology, which is part of NX ReformTM hydrogen technology portfolio enables cost-effective hydrogen production and offers the potential to reduce the carbon footprint by incorporating CO2 capture technology. It offers flexibility in feedstock and capacity, ensuring production adaptability. The solution is based on proven and widely adopted steam methane reforming methods, resulting in high operational efficiency. Once the project reaches the construction phase, KT TECH will also supply the proprietary equipment for the steam methane reforming process.
 

This article has been tagged under the following:

Downstream news